Experience

Experience

REPRESENTATIVE PROJECTS:

FDOT Hard Bids E8P97 E5Y62 Highway projects including large earthwork and structures bid items.

USACE Engineers, Florida S-265 and S-266 Hydraulic Structures for flood control.

Crystal Lagoons, North Miami, Florida: Prepared independent estimate for 6 AC lagoon in North Miami Beach.

FDOT SR 23 Design Build, Jacksonville, Florida: Design build project, that included over 10 miles or roadway construction (new and widening), seven bridges, drainage, ITS and signage. Developed contacts with local subcontractors and suppliers.

SR-23

Ohio River East End Crossing, P3, Louisville, Kentucky: P3 project that included earthwork, roadway, tunneling and cable stay bridge over the Ohio River.

USACE Bechara Industrial Area, Puerto Rico: $36M 90″ Sewer Force Main, Cofferdam, Deep Soil Mixing and Earthwork.

MDX 874 Expressway, Miami, FL: $55M Design Build Estimate for bridge and roadway expansion.

Via Verde Gas Project, Puerto Rico: 90 Km of 24” gas pipeline across Puerto Rico.

USACE C-44 Reservoir: $33M channel excavation and appurtenances

USACE Rio Puerto Nuevo, Puerto Rico: Dredging and flood control Project in San Juan, PR.

Río Puerto Nuevo

USACE Rio de La Plata, Puerto Rico: $32M Flood Control Project.

USACE Site 1 Impoundment, Palm Beach Co.: $45M Large earthwork and soil cement levee project.

USACE Picayune Strand Project: $60M Merritt and $80M Faka Union Pump Station.

Miami Dade County 20” Watermain and 54”Force Main Replacement, Miami, FL: $50M Microtunnels between Port of Miami and Fisher Island.

South Miami Heights Water Treatment Plant: $50M Deep well water treatment facility.

CD WWTP Sludge Removal
SD WWTP

Camp Lejeune, Jacksonville North Carolina: Military base main access road improvements. Work included earthwork, roadway, and bridge construction.

Government Cut, Miami, Florida 1200 LF microtunnel for 54” sewer force main across main PortMiami channel.

Valenciano Dam, Puerto Rico: RCC dam in eastern Puerto Rico. Work included batch plant, RCC dam construction and appurtenances.

SFWMD: More than 5 pump station bids throughout South Florida.

MDX Central Blvd, Miami, FL: Competitive estimate of road and bridge project at MIA.

Miami Dade Central Boulevard
Miami Dade Central Boulevard

Matlacha Bridge Replacement, Lee County: Competitive estimate of single-leaf movable bridge.

Mathlacha bridge

Miami Dade County Children’s Courthouse: Large federal building project in downtown Miami.

Miami Dade County Children Court

I-395 Improvement Project: Developed conceptual estimate for this unsolicited proposal.

Autopista Miami

AMS Steel Mill, Puerto Rico: Development of conceptual construction estimate for private client.

San Vicente Dam Raise, San Diego, CA: Roller Compacted Concrete Dam enlargement.

San Vicente
San Vicente
San Vicente
San Vicente

Collaborated in numerous large scale international construction programs for some of the most important Program Managers in the U.S.

CH2M HILL

Program Management Services for Relocation of USFK Installations DEC 2007 – OCT 2008 (Seoul, Republic of Korea)
Lead Estimator assigned to field office. Responsible for preparing parametric as well as detail estimates for this $10 billion program, the largest U.S. military base relocation. Typical duties include preparing construction cost estimates of approx.
1300 facilities including buildings and infrastructure projects using specialized software, maintaining local cost database and cost loading schedule. Developed Program Baseline Estimate and reviewed risk analysis model.

Korea
Korea

PARSONS CORPORATION

Saadiyat Island May – Nov 2007 (Abu Dhabi, UAE)
Senior Cost Engineer responsible for all aspects of cost management including cost tracking, trend analysis and monthly reporting for this large luxury development ($26 billion). The scope of work encompassed dredging 40M m3, enabling works, roadwork, utilities and bridges for this more than $5.6 billion program.

Saadiyat Island
Saadiyat Island
Saadiyat Island
Saadiyat Island
Saadiyat Island
Saadiyat Island

Department of State, Iraq Project and Contracting Office – Water Sector. 1st Tour Apr 2004-Aug 2005, 2nd Tour Jan 2006 -Apr 2007 (Baghdad, Iraq)
Project Controls Manager and Lead Estimator providing program management and project management for a 220 project, $2.0 billion Capital Improvement Program as part of the United States’ Project and Contracting Office, Baghdad, Iraq.
As Project Controls Manager, responsible for all cost reporting, schedule updates and estimating tasks. Reporting directly to Operations Manager on all government submittals.

As Lead Estimator, responsible for providing Independent Government Estimates for Public Works projects (water treatment, water conveyance and storage, wastewater collection, wastewater treatment and solid waste landfills) as well as Water Resources projects (irrigation & drainage, surface water storage, dams, canals and flood control) ranging in cost from $250,000 to $270 million. Prepared estimates ranging in level of complexity from conceptual (budget level) to detailed (construction documents).

Participated in negotiations with Design-Build Contractors and provides professional advice to Contracting Officer. Supervised and trained local Iraqi junior estimators in daily estimating tasks. In the Capacity Development program, taught two estimating seminars in Amman, Jordan to Ministry employees including the use of specialized software.

Irak
Irak

Some of the representative projects include:

  • Erbil-Ifraz Water Supply $200M: Water Treatment Plant and Conveyance, northern Iraq.
Erbil Ifraz
  • Nassariyah Water Supply $266M: Water Treatment Plant and Conveyance, southern Iraq.
Nassariyah
Nassariyah
Nassariyah
Nassariyah
Nassariyah
  • Balad Rooz Water Supply $66M: Water Treatment Plant and Conveyance, central Iraq.
  • Eastern Euphrates Drain & Nasiriyah Drainage Pump Station ($45M and $100M, respectively) Large irrigation project, southern Iraq.

Picayune Strand Restoration Project, Naples, FL (2005)
Lead Estimator for the SFWMD Picayune Strand Restoration Project: Merritt, Miller and Faka Union Pump Station ($125M), Nubbin Slough NTA Enhancement Project ($16M) and C-23 Canal ($5M). Providing detailed construction cost estimate during various stages of design, including, large earthwork schemes, pump stations construction, and conveyance pipelines.

24th St Water Treatment Plant Phoenix, Az (2005)
Prepared Asset Management estimate of more than 500 construction items for a 20 year replacement plan of approximately $230M.

Coachella Valley Water District, Automated Process Air Control System Upgrade, California (2005)
Estimated 90% construction documents of complete aeration system for this water reclamation plant, approx. $6M.

Miami International Airport – North Terminal Expansion 2000-2004 (Miami, Florida)
Senior Estimator assigned to the Miami World Gateway Program ($1.6 Billion). Program consisted of new concourse construction, APM, terminal remodeling, apron work and taxiway modifications. Responsibilities included preparing conceptual and detailed estimates, reviewing Construction Manager’s estimates and updating program budget.

In charge of all civil work change order evaluations, preparing independent estimates and negotiating with subcontractors during construction. Other duties included maintaining package schedule as cross training.

Representative projects: 728B M&N Taxiway, All apron projects for NTD from 30% to 100% Design Documents and Cc D Extension Interiors Project.

Miami Airport
Miami Airport

Lisbon International Airport Various Visits 2001-2002 (Lisbon, Portugal)
Provided estimating support to Program Manager involved in the Master Plan for the New Lisbon International Airport in Ota (€ 2.0 Billion). Prepared conceptual estimates for over 20 regional airports as well as refurbishment for existing Lisbon Intl.
Airport. Prepared earthwork analysis and complete risk analysis for the new airport. participated in technical presentation to Portuguese ministry officials detailing risk analysis and contingency development using Montercarlo simulations.

Reina Beatrix International Airport 2002 (Orangestaad,Aruba) Provided conceptual estimating support for airside and terminal improvements ($100M). Provided civil estimating support for apron expansion

Jorge Chavez International Airport 2000 – 01 (Lima, Peru) Member of technical team that traveled to Peru for the evaluation of proposals from proposers from Germany, US, Spain and France. Responsible for evaluation of estimates, phasing, scheduling and constructability proposals for this Concession Program ($800 Million).
Prepared technical paper on preloading techniques for the 2nd runway presented to government officials (COPRI and CORPAC). Participated in proposal preparation for Supervising Engineer contract.

Aeropuerto Jorge Chavez

Jacksonville International Airport 2000 (Jacksonville, Florida) Assisted program manager with conceptual estimates for various phasing schemes. Obtained preliminary quotes from local contractors for civil work and developed independent estimate. Work included terminal expansion as well as civil airside improvements.

RYAN INC. EASTERN / RYANGOLF 1996- 2000 (Deerfield Beach, Florida)
Responsible for complete bid preparation for large heavy civil general contractor and specialized golf course builder. Typical projects include highway (FDOT and County), residential site developments golf course construction, aggregate mining, earthwork, water and sewer projects, dredging and ground modification projects.
Main duties included complete estimate preparation, scheduling, contract negotiations, change order review, claims analysis and project management assistance.

Ryan
Ryan
Ryan

Other duties included participating in bidding and business development efforts in Latin America. Company averaged $120M/year in new contracts. Major projects included large signature golf course/residential turn-key bids averaging $20 million and as high as $40 million in South Florida, large track residential development involving large equipment such as draglines, dredges and large fleet of heavy equipment, and municipal and state roadway/bridge construction.

Langan Engineering 1993- 1996 (Aventura, Florida)
Duties included geotechnical construction inspection and conducting subsurface investigations throughout South Florida and the Caribbean.

Projects included:

  • Earthwork and Utilities construction, high-rise auger cast pile installation, settlement monitoring, preload construction and monitoring, roadway construction.
  • Engineering analysis duties included slope stability analysis, preload height calculations, dewatering analysis, geotechnical report and certification letters.
  • Major projects included Harbor Islands by Avatar Development a 700-hectare 2-year preload development as well as several 30-story plus high rise building development projects in Miami and Broward County
Geotech
Geotech

Construction cost estimating consultant for various capital improvement airport programs. Typical assignments included conceptual as well as detail construction costs estimates of terminals, airside and runways. Due Diligence Reports were typically presented in Capex and Opex breakdowns.

Duties included geotechnical construction inspection and conducting subsurface investigations throughout South Florida and the Caribbean.

Representative airport projects include the following:

Quito International Airport, Quito, Ecuador (2002)
Complete airport development estimate. Work included large earthwork scheme, new terminal development, runway construction, water and waste water infrastructure. Traveled to Toronto, Canada to present estimate results to investors.$700M

Quito Airport

Lima International Airport, Lima Peru (2001)
Review of Lima Airport Partners Capital Development Plan. Work included review of terminal, ramp and runway costs.

Silvio Pettirossi International Airport Asuncion, Paraguay (2003)
Conceptual estimating of airport development and modernization.

Prague – Ruzyne Airport , Prague, Czech Republic (2003)
Review of airport expansion development estimate, scope included terminal and airside renovation and expansion.

Praga

Other Airport Projects :

  • Mozambique International Airport
  • Angola International Airport
  • Aeropuertos del Sureste de Mexico (ASUR) Cancun
  • Temuco International Airport, Chile

Estimating
HCSS – Heavy Bid, U.S. Cost Success Estimator, Timberline Estimating.

HCSS
HCSS
Success Estimator
Sage Timberline

Takeoff
Paydirt, Agtek Earthwork Systems and On-Screen Takeoff.

Earthwork

Scheduling
Primavera Suretrak, Primavera P6 (basic)

Risk Analysis
Palisade @ Risk

Copyright 2018 Global Construction Estimating Corp. | All Rights Reserved